Video: Designing for Density: Thermal Strategies for AI Data Centers | Duration: 2773s | Summary: Designing for Density: Thermal Strategies for AI Data Centers | Chapters: Welcome and Introduction (32.760002s), Introduction and Context (125.305s), Liquid Cooling Solutions (270.665s), AI Cooling Requirements (419.78s), Scaling Thermal Strategies (559.26996s), Cooling System Fundamentals (689.145s), Retrofit vs New Build (827.555s), Collaborative Data Center Planning (1047.295s), Legacy Adaptation Challenges (1224.39s), Efficient AI Infrastructure (1449.5s), Resource Planning Priorities (2208.5s), Priorities and Goals (2329.175s), Q&A: Thermal Strategies (2371.51s), Retrofitting Facility Priorities (2455.04s), Warmer Water Planning (2531.0251s), Closing Remarks (2638.075s)
Transcript for "Designing for Density: Thermal Strategies for AI Data Centers":
Hello, everyone, and welcome. Thank you for joining us today. This session is brought to you by BizClick in collaboration with Johnson Controls, and it's great to have you with us. Today, we're focusing on a topic that is becoming increasingly critical as AI adoption accelerates across all industries, how to design thermal strategies for the next generation of AI data centers. I'm Ella Wilkinson, and I'll be your host for today's discussion. AI workloads are fundamentally changing the demands placed on data center infrastructure. As compute density increases, many of the assumptions that shaped traditional facility design are now being reevaluated. We're seeing higher rack densities driving new cooling and power considerations, growing pressure to improve efficiency while maintaining uptime and resilience, and increasing focus on how operators can design infrastructure that remains adaptable as AI requirements continue to evolve. So the challenge is no longer simply about supporting more compute. It's about creating thermal strategies that can scale sustainably, operate efficiently, and support long term flexibility. So joining us today is someone with deep expertise across data center infrastructure thermal management, Meher Nondekulia, data center global business development manager at Johnson Controls. Meher, it's great to have you with us. Great to be here, hello. It's honestly such a pleasure. I have given you a very, very, very quick intro there, just name and title. So no one could introduce you better than you can introduce yourself. So can I get you to tell me who you are, what you do, and and why this is such an important topic right now? Absolutely. So, you know, first of all, you know, with within Johnson Controls, we've got a dedicated global data center, business, and I I lead our thermal management, strategy portion of that. So that means, one, we help our customers achieve their goals in terms of thermal management for their data center facilities, that is within whatever constraints they have. We take our technologies and then we, you know, work across the the thermal chain with partners or other businesses within Johnson Controls to find ways to move the heat from their data center out to to where it needs to go. And then the second part of our our business is that we interact with the community through events like this or conferences and share our learnings and exchange ideas to enhance our ability to do that more efficiently, more sustainably, more effectively. Fabulous. So you'll you'll obviously have so much to say on this topic then because this is, you know, probably the biggest topic for data centers at the at the moment. Absolutely. So let's set the scene then. Obviously, AI is driving a huge increase in rack density and thermal demand. So from your perspective, what would you say has changed the most significantly over the last few years? Well, I think you hit the nail on the head right there. It's it's the density. Right? For if we take a look, you know, down memory lane, data centers used to really just be a network closet on the end of a building, then there was a sort of an attachment that had racks in it that were, you know, five or eight kilowatts. And there was always these these, you know, thoughts that, oh my gosh, every, you know, every year next year, it's gonna be 50 kilowatts and a 100. And that reality never struck until the last two or three years where we started seeing GPUs make their way into data centers, these very dense chips, and they're obviously utilized for AI and that's driven up the amount of, you know, power that each individual rack and therefore the amount of heat each individual rack puts out into the space and it causes us to rethink the way that we need to extract that heat, out of those racks, out of that data hall, out of the data center as a whole. So how would you say operators then are thinking differently about data center design as as AI becomes more prevalent? Well, you know, you hit a certain limit as you cross that 20 to 30 kilowatt per rack level. If you keep it buying, 20 to 30 kilowatts is the amount of cooling that you need for for a typical single family home. Right? And that becomes the limit that you can, you can still cool with air, but once you cross that level and and today's racks are about three times to four times as much heat, as much power as 20 or 30 kilowatts of a single family home. You need to rethink the type of fluids, the type of, heat exchange or heat heat capture that you need to utilize to extract heat from those those chips. And that that type now is liquid cooling or direct to chip liquid cooling, to extract the heat from these extremely high powered, extremely capable GPUs that are performing these AI workloads. So you're starting to see a a use of liquid flowing directly in the racks as opposed to being on the perimeter blowing through CROS or other air handler equipment. So right. Let's talk about cooling then because it's traditionally been air cooling, air cooling, air cooling, and now we've got liquid cooling because we because we can't air cool, you know, that that much compute. Yeah. What so organizations risk overlooking when the approach is either air cooling or liquid cooling? So, you know, it's important to, you know, provide the right right, solution for the right challenge. So things like GPUs, for example, today, put out so much heat in a very, very small dye, you know, 50 millimeters to 50 millimeters. And that drives the need to have to put a different type of cold plate that takes liquid as a medium, which is much more dense and able to take that heat away. There are other parts of the data center that haven't changed all that much. You know, some of the standard networking racks, some of the power supplies, other loads in that data hall that can still be cooled through air. So it's not just my whole data center's liquid or my whole data center's air, but it is a hybrid approach. It's understanding that ratio and it's thinking as you look in the in the future that is that ratio going to be the same as I change the type of power I bring, change the type of chips that I use, change other things in in the room. Do I have flexibility to float between that air cooling capacity, liquid cooling capacity, and the infrastructure to support it. And flexibility is a big thing when it comes to cooling, really, because AI has increased so much in the last few years and its ability has increased so much. Surely cooling will follow a very, very similar trajectory. Cooling is taking off in in an exponential path as well because for every watt of power consumed by these types of GPUs and and large AI factories, you need one watt or kilowatt of cooling by the cooling system. Now the the way that that occurs will certainly transform as we look at these AI workloads that utilize liquid cooling. You can operate at warmer temperatures and therefore, that lends itself to more dry cooling, less evaporative cooling needed, to hit efficiency goals. And so it it certainly changes the mix and the the strategy of extracting that heat, but it it still requires a significant thermal load to be moved out of that building, so that those chips can operate properly. So, obviously, alongside then performance and cooling demands, how would you say conversations are changing around uptime resilience and PUE evolving as, you know, density increases it? A lot of it depends on the application of the AI workloads. In the in the case of training, what we're hearing is a a stronger focus on speed to scale, of course, but also PUE because you wanna build these models in the most efficient manner. When it comes to, you know, the, you know, the use, the inference of those AI models, especially when you're talking about physical AI, right, AI that controls robotics or even, you know, advises a driverless car on on what to do. Uptime, quick response to that application is extremely important. And so the the use case will definitely impact what what's being done there, but that also will change the uptime, needs and the resilience requirements. You know, for example, somebody may be willing to take a minor trade off on PUE in order to make sure that that AI system can respond to something in the physical world that needs its input. Whereas somebody might say, I'll prefer a better PUE when I'm training this very large language model, even if there's a blip in power at some point in time, it's not gonna change the overall training over a course of months. So right. Let's move on to to scaling these thermal strategies. As organizations start planning for these higher density environments, what would you say are the key principles they should be focusing on today? You know, I think the first is, you know, really understanding the resources you have available. Right? When when you're going from, you know, 20 megawatt, 30 megawatt data center to all of a sudden a 200 or even a a one gigawatt data center, The amount of land, the amount of power, even just the amount of labor that you need to put together such a such a facility, it it scales in a way that it, you know, it's hard to even imagine. Right? On paper, adding a zero to the number of megawatts that you need is seems simple but then getting 10 times the amount of, power equipment, cooling equipment, running pipe that moves 10 times the amount of thermal mass, really starts changing. And so it's it's understanding the scale, understanding the resources you have available to do that. You might need to change geographies in order to get those resources, you know, land or or power or even good climate. And and so those are the things that folks should really understand before thinking about deploying a gigawatt campus, you know, so somewhere that they wanted to to deploy that. And is there a word of warning there that's kind of saying, you know, learn to walk before you can run? You know, I think what we're seeing in the industry is everyone's lining up for the for the 100 meter dash here. So there's not you know, there isn't in, you know, you know, there isn't a need necessarily to walk, jog, then run because the blueprints are out there. Many folks have deployed, you know, AI factories at scale. There are lessons to learn from there. I mentioned part of my my work is to go to conferences and share the knowledge we've got. I know that there are many of my peers and and the the, you know, tech giants that are out there who are happy to share the lessons they learned in scaling, because it ultimately helps the whole industry do it more efficiently, more effectively Mhmm. More reliably. It's nice that it's a shared mission there. Absolutely. So what would you say then still applies from traditional data center design, and what has actually fundamentally changed for this new evolution of AI? So the fundamentals don't change in that, you know, you you need to bring some medium to these chips, keep them below the temperature that they need to be to operate, bring that heat out typically through a chilled water loop, and and put put them into the, you know, air outside of the data center. What what fundamentally changes, you know, is kind of a little bit back to the scale. Right? What what when you put 30 megawatts worth of chillers on on a given roof, you know, the traditional breeze and the air from those fans can move that heat up in a way. When that rooftop now has 300 megawatts or 500 megawatts worth of chillers or dry coolers, there begin to be, for example, hot spots form there and not planning for those can can create a challenge. You know, when it came to blowing air through a data center, you know, it was as simple as, you know, managing the pressure, making sure it hit the right racks, it comes back, it gets filtered, and comes right back out. Similarly, on a CDU, you may think it's as simple as, well, force the water out there, make sure it's got the right pressure at every rack, It comes back, we filter it, and through the CDU and and repeat that cycle. But chemistry is also something that comes into play when you're talking about fluids. Are we making sure that we're not, you know, fouling up cold plates because that will have a dramatic impact on the ability to cool. Weight becomes another factor because all of these, you know, racks are now filled with liquid, which is certainly heavier than air, obviously denser. So all of these different nuances that someone may not have thought about when they're just thinking about it purely from a cooling or heat extraction standpoint that, wow, this rack got, you know, a thousand kilograms heavier, because I made this choice and it it it it's not a bad choice. Everyone needs to, you know, consider everything that the the most efficient way to extract heat from from an, you know, an AI powered GPU. But, you know, considering all of those impacts in the building in terms of, can I even do raised floor anymore with the weight of these racks, really changes how these data centers are being built? So it's more about the preplanning stage then, I guess. But Yeah. Understanding the impacts for sure. But then, obviously, there's there's so from your perspective, is it better to build an AI purpose built data center or retrofit onto an older data center that's already got an established, you know, rhythm and established movement? I don't think it's necessary to make those choices. Obviously, purpose building an AI factory from the ground with some of the blueprints that have been put out there by some of the leaders in the the industry, might be an effective way to do that, but it may not be the most most resource efficient. Certainly, you can look at, you know, a lot of the infrastructure that may exist already for, for a traditional existing data center and say, you know, okay, I I only have this physical footprint and this amount of power available, but what can I do in this particular location, to to expand into the AI realm that might mean using the same pathways that were used, with a lower voltage busway and put a higher voltage busway and get some more power to each individual rack? That might mean relooking at how the gallery is designed and can we fit liquid cooling and support the weight and piping in there. That might mean using other high density options in the white space such as, you know, rear door heat exchangers or, other methods to manage the density in a little bit of a different way. So retrofit certainly isn't off the table, but, you know, it is likely that if you're looking at a gigawatt style AI factory deployment, you know, a new build is probably the most effective way to accomplish, you know, that outcome. But then, obviously, like I mentioned earlier, AI is, it it's growing every single day. You know, what we needed six months ago versus what we need today is is vastly different. Mhmm. So even if we did build a purpose built AI ready super super super data center, how do we make sure it's future proof? So it it really comes again from this collaborative environment that that I think we're in. But most folks today, specifically in the tech world, are pretty clear about what their road maps are through the next couple of years. And, obviously, that's going to involve as we go five and ten years out. But what remains true is that you've you've gotta bring, you know, cold medium, typically water into the facility and and it captures the heat and brings it back out. What remains true is that within the white space, you'll need, you know, a liquid and or a coolant distributed to those racks and and they'll capture the heat and they'll bring it back out and exchange it to that facility loop. Things like planning for, potentially future and large piping to manage larger flow rates for more power chips, leaving space for bigger power, leaving provisions potentially for transitioning to 800 volt DC as opposed to the AC power that's there today to enable some of those future racks because we've got the indications again from some of this, the chip makers that that's where things may go. These are the things that can be put into plan today. They don't need to be built today, but planned for that in three or five years when IT equipment's refreshed, you know, either, you know, the pipe's already sized and the space is left for that higher flow pipe, or higher flow CDUs, to manage the the next generation of of rack or, you know, IT infrastructure. And this sort of preplanning that you're suggesting, do you see that at all with any legacy environments? Or is this something that we're suggesting now going forward? You know, I think most of the when I say legacy, I say, you know, five years and and more behind that. I think many of those could did not foresee the the likelihood that liquid cooling would have been the the primary way to pull heat out of these racks. Right? And so when we look at today's racks in these at least the AI focused ones, you're talking at least sixty, seventy, maybe even 80% of the heat is brought out through liquid. I don't think that was incorporated in the most legacy designs, but not because of poor planning, but just because that that wasn't a a style of heat extraction that was commonplace at the time. Today, now that we know that, you know, liquid direct chip is going to be commonplace at least for the next half a decade. I think a lot of folks can plan and say, well, I I can leave space for additional coolant flow or, you know, I can leave space for additional power bus ways as I know that these racks will go from a a 120 kilowatts to maybe 700, 800 kilowatts. And I guess the planning of these future data centers, they they require a lot of creativity and and they that open mindedness to what could, you know, potentially be be the next technology that that that graces us. Yeah. Yeah. I mean, so it's hopefully less creative and more, collaborative, right, with a lot of folks like the chipmakers and those that, you know, design the coolant racks, the coolant systems that distribute to the racks, and those that just design the bus way and and the power systems and those that, you know, design the CDUs and say, well, what what is possible? What are the thermal limits? What are the power limits? If I were to, you know, use x amount of power in this row instead of y, how much space would I need to leave? You know, do I need to raise my roof in other, you know, foot or two so that later when I when I come back and have to, you know, refresh my equipment and change some of the power delivery or the the coolant delivery, that I'm not physically limited by my building. Yeah. So I think more collaborative, less creative, and then I think generally, what we find is in order to share the information best, it has common blueprints. Everyone's gonna change it a little bit, but, you know, a good consistent blueprint say, hey. Here's a generally good way to do this. You know, here are the the, you know, the the blocks and pieces that we need to build this out of. And then if, you know, somebody has a a slight variant or flavor of doing that, they can tweak that a little bit. But starting from some sort of a blueprint allows folks to do this with speed, do this knowing that they're not on an island, meaning if they go for guidance, there's probably a dozen folks speaking at the next conference at a seminar to share some insights of how they managed certain challenges through that that design. So let's let's focus on some of those challenges then. Where but legacy environments, I'd suggest. Sure. Where do people tend to find problems when they are adapting legacy environments? You know, I think it the the limits that were not considered, you know, five plus years ago that today are considered norm. So, you know, the amount of, physical space that's needed to route, you know, power, coolant above the racks. Right? The amount of space left above the racks was typically there, you know, for a little bit of air distribution, air return, things like that, maybe a small amount of power delivery because, again, 20 racks at at five kilowatts might have been a 100 kilowatts. Now we're talking about 100 kilowatts in one rack and numerous of those in one rack. So the amount of space for power delivery, you know, certainly changes. You know, I really think that the major difference is the method of cooling between, the old, you know, the the more legacy and the more modern data centers or really the more modern data centers or what I call AI factories. And then then the immense amount of power delivery, associated with that. Brilliant. So so from your experience then, obviously, you've seen loads and loads of transformations here. Where do you see organizations tend to underestimate the complexity when preparing for higher density cooling requirements? I think a lot of it comes back to, for example, scale. Like, AI workloads are are known to to rapidly change the amount of power they consume and therefore the amount of heat they produce. They can be operating at 30, so on a gigawatt, you know, 300 megawatts. And then within a moment, suddenly consume 700 megawatts more for a few seconds and then drop back down. How do you manage that from a pump flow standpoint from the the, you know, the chillers that might be there rejecting that heat out to the, to the ambient? All of that becomes really important to track, to monitor, to, to really plan for, whereas typical cloud environments, you know, again, not that they were stable, but they didn't fluctuate as rapidly as quickly. So the so complexity is how fast things change in a dense environment and the magnitude of those changes. I talked a little bit about, you know, managing that much heat rejection in a certain amount of space. The other is certain assumptions that were used that, you know, if I if it gets a little bit warm, I can I can use a you know, I can use some water and evaporate it and and, you know, still ride through a high ambient event? When you look at the scale of water you might need at, you know, a gigawatt campus, it would be like 40,000,000 liters in a day to to ride through a heat wave event. And so, you know, while, you know, one one hundredth of that might have been practical at a 10 megawatt data center, you know, demanding 40,000,000 liters in a day on a very hot day when other things in that community, that city might have needed that amount of water, becomes a non practical use of of a resource. And so that means your design needs to incorporate what happens in that one in 20 or one in 50 heat wave event. Am am I ready to manage that manage that across a gigawatt worth of, you know, of of heat capture, heat transfer, heat projection? And then it that comes back to the collaboration point, you know, making sure that everyone that you're advised by the correct people. You have been you have the correct stakeholders. Everyone is aware of you're all in the same team here. Yeah. Absolutely. I mean, the the last thing we want is a phone call from all of our largest, you know, partners that on the hottest day, you know, the the the chill have tripped off. There are things that we know about spacing, about mitigation, about a variety of other different things that, you know, that we know that folks can incorporate in design and planning to mitigate that that switch off or that trip off from happening. So let's look in at building efficient and resilient AI infrastructure. So, obviously, as density deployments become more and more common, how should organizations actually approach the relationship between cooling, power, and operational resilience? They're they're all become beginning to become extremely tied. So one of the key things that we're seeing in The States and in other places as well, even even starting to be in the EU, and and soon I think in in The Middle East and and parts of APAC is that the grid simply don't have the ability to give you a one gigawatt connection. Right? I mean, even asking the grid for a couple 100 megawatts for some of these AI factories, is is a significant, ask is a big lift for these utilities. And it also puts a lot of the infrastructure investment on the utility, which does tend or can tend to pass to rate payers. So to eliminate the that challenge, you're seeing a lot of folks put on-site power, within their data centers. I mean, upwards of a third of folks that we talk to are are saying that they're considering, off grid on-site power for for their data center. That allows one thing is that you kind of control your own destiny in terms of, getting power rather than relying on the uptime or resilience of that grid. The second thing is you've got an amazing unlocked efficiency opportunity of absorption chiller. So any almost every power generation, style. Right? Whether it's fuel cells, whether it's a gas engine, whether it's, you know, hydrogen based, there's there's thermal energy that comes as an output of that power generation. Thermal energy can be used to drive a particular type of chiller called absorption chillers, which reduce the amount of electricity dramatically for that central plant. Almost half of the power for this the cooling plant comes, is eliminated by doing that. So creating that ecosystem, we call it a combined cooling and and heating plant, for the data center is is a huge efficiency advantage or an opportunity for these data centers. And it comes surely from that scale and that desire for resilience beyond what the grid can offer. So you're becoming a a kind of self sufficient ecosystem there. And you're also not upsetting your neighbors, which I think is massively important. Yeah. Absolutely. That's that's one of the key things is and and, you know, probably one of the things that's overlooked a lot really is, you know, we have to begin designing these things beyond just our cooling function. Right? I talked about water use earlier, power use is key, but, you know, noise is another one. But but the less you tap into the the neighborhood, the the local resources there, the less you're taking away from them. And then conversely, you're putting down, you know, hundreds of pieces of equipment, whether they're chillers or generators, they're UPSs, they're other, components even though I mentioned all the chemical management within that cool loop. Those are great jobs to create for folks that, you know, are are in the the region that frankly AI cannot do those jobs. Right? AI can't do the chemistry management. AI cannot replace relief valves on chillers, you know, and so or or replace oil filters and so that's something that, you know, is a way for these, facilities to avoid resource consumption, but then also be great neighbors, create jobs for the community that they're in. So as you look ahead then at the next the next lot of data centers that are going up, do you believe people are taking into consideration, you know, the social aspect, but also the new calling requirements and, you know, where they're situated, what what facilities are available? Do you think it's become a much more integrated way of thinking? Absolutely. Yeah. Most of our conversations, you know, you know, if we if we spend a few months with with one of our clients designing, you know, their their facility, the first few weeks of the conversation are basic cooling function. Here here's the architecture we're gonna use. From there, it becomes how we advance beyond cooling function and think about all these other different things that that impact around. How do we integrate better with the power limitations that might be there and and avoid peak demands that might, you know, do something different to a grid? How do we do something different on water use? How do we do dip something different on sound use? You know, or even, you know, manage sound across time. For example, there's a night ordinance that, you know, we might we might be okay to make a little bit of noise during the day, but at at night, we've gotta, you know, allow our neighbors to to, you know, have a peaceful night. So what are what are the changes that we need to make in our designs for that? So most of the conversations have elevated just beyond pure function of cooling and moved into, you know, how how do we be a better neighbor? How do we, you know we have limited resources and we don't wanna create an impact to our neighbors. What does that mean from a cooling aspect? So, Elliot, you obviously mentioned monitoring being very important. You need to stay on top of the numbers so you you make sure you don't have any power outages or, you know, take all of the water from the local community. Right. But what role does monitoring and visibility play in managing that increasing dynamic thermal environment? I think as you move into these AI, factories, it becomes even more important, right, because of the dynamic nature of these chips and how quickly they can suddenly demand power and suddenly stop demanding power, suddenly create a lot of heat and suddenly not do that. It's really important to make sure that, you know, the coolant loop, for example, is very aware of what it is that's going on at the chip, at the rack, at the manifold, so it knows what to do with its pump, and and how much flow to provide of that coolant to keep the chip from throttling. Similarly, the outdoor facility equipment, whether it's the air cooled chillers, dry coolers, some other equipment that might be there, need a, some thermal storage to because they're not gonna react within seconds. But b, they'll need some nature of a heads up to know, hey, this huge influx of of load is coming and if you've only got a third of your chillers running because the the chips were at 30% and suddenly you need to fire on, you know, all 100 of the chillers or whatever it might be, a 100% of the chillers. You need a signal and you need that to come from very precise, very, integrated monitoring from the rack level all the way out to the facility. So this is where kind of DSM, which is the data center infrastructure management system and a traditional BAS, which is the building automation system. Those two things need to really communicate very well and manage that dynamic load, that dynamic nature of those those chips, those GPUs, to prevent any throttling from from the system. So is this, you need you need a person to look at, you know, this in real time? Do you need a team to look at this in real time, or is this something that we can actually give to AI to have a look at? I think it leans more toward can can digital systems connect first? And then, yes, of course, an AI overlay to understand the nature of what is that data telling us, and then go and signal to the BAS system, that this is what what we need to do. Today, most BAS systems are sort of in, preprogram sequence. If x happens, do y. If, you know, just just like your thermostat at home. Right? If it rises above, you know, 23, then turn on the air conditioner and if it falls below 21, turn it off. Right? Of course, it's a little bit more complicated when it comes to a, you know, 100 chiller plant, but it's usually a preprogram sequence. This would evolve a little bit beyond that and say, you know, we're gonna under you know, use potentially, use AI to understand what's going on within the data hall, within the TCS loop. What what do I need to then do and command my CDU to do? What do I need to command my pumps to do? What do I need to command my dry coolers or my, chillers to do? And that that that's how we have a a fully synchronized system rather than this waiting this one, you know, the BAS system waiting for something to happen on the TCS side to then figure out which part of its sequence it needs to initiate. So there's also increasing pressure to improve sustainability outcomes. And, obviously, you've spoken earlier about about a lot of waste heat that can be reused. How are organizations now balancing efficiency goals with the operational, you know, reality of of that more intensive workload? Yeah. So, I mean, efficiency is at the center of of a lot of this. I mean, look, the the the bill the the energy bill to run the the chips won't change if you cool it more or less efficiently, but the energy bill related to the cooling will change if you have, you know, more efficient or less efficient equipment, but not just equipment systems. So, you know, a lot of our the folks that we talk to are are utilizing the opportunity presented by the latest generation of GPUs that allow for warm water cooling to raise their chilled water temperatures from 19 to 24 c to 27 c, in some cases as high as thirty two thirty four c, because the chips enable that to happen especially when it comes from liquid cooling. So liquid cooling, in theory, has given us that that opportunity that once you move from air to liquid, you can raise the water temperature and that raises, you know, well, that that reduces the amount of work that the the chiller may have to do or the number of hours the chiller needs to run. And so it, you know, it also theoretically makes it easier to ride through some of those heat waves, you know, that I mentioned without the evaporation of water. So efficiency certainly is at the core of, of that cooling design. Right? The first thing is function. Right? Can I truly move all this heat out? Then how do I make it efficient? And how do I make it sustainable, you know, using, the right refrigerants, using, you know, less water, and then how do I be a good neighbor? You know, can I eliminate the sound? And then you mentioned heat exports. So then there's two ways of of reusing heat. Right? The first, when I say reuse, I mean, you know, there's truly waste heat when you generate power, that thermal energy can go and drive some types of cooling equipment, then they don't need a compressor, they don't need the electrical input. There's there's a whole hour I can do on that piece, but but absorption chillers are really a great opportunity when it comes to on-site power generation. The other part is, of course, heat export. So there's still a massive gigawatt worth of heat coming off of these, you know, these servers. And I mentioned each each rack, if it's a 100 kilowatts, well, that's, you know, two or three single family homes worth of heat times hundreds of of racks in that space. You know, exporting that heat through a district energy loop to an you know, if you're in a dense city, let's say Frankfurt or or, you know, London and you can export that heat into, you know, a neighborhood or even, you know, if you're near an airport, you know, you you could heat a very large facility that would otherwise consume fossil fuels or some others energy source to to generate that heat. Instead, you can, you know, extract it from here. You can export it from the data center to a district energy loop, offsetting one, the cooling that needs to be provided provided by the chiller facility system at the data center, but two, the energy that would have been used at that other location to create that heat in the first place. So great opportunities for, increased sustainability, heat export, heat reuse, and and really integration between, that data center facility, that AI factory and the the community it exists in in a power positive way rather than a power negative way where it consumes resources from that community. Yeah. Perfect. And it it can just be, again, the the good neighbor, the best neighbor. Right. Exactly. That that's what it comes down to. Right? Is that, you know, at at the end of the day, if if, you know, if if you're not you're supporting the community you're in, then the next data center that you wanna build in that neighborhood is is likely not going to be approved or or whatever it is. And I think a lot of our the the folks that we work with in the industry are cognizant of that and do a lot in their design to plan around that. So finally, we've got time for one more question in this section. If you are an operator beginning to plan for the next phase of AI infrastructure demand, what is the first practical step, the first practical conversation or decision that you'll prioritize? I think it's really understanding the the blueprint that you want to build based on and the resources that you have. And and I think as as you start to study that, you'll learn that certain things, you know so for example, a lot of folks will think, oh, I can, you know, tap into stream water, you know, or or, you know, another natural body water for heat rejection instead of, you know, pulling from city water. And as they dive down that resource rabbit hole, they realize the amount of river water I need is is at such a high magnitude that it may not be an option. So really, dive deep into all the different resources you assume that you have, if you're scaling up from, you know, 10 or 20 megawatt to a gigawatt. Dive into those those resource assumptions because I think you'll find that, you'll hit bottlenecks, that you didn't think you would ever hit. And so I think those are the first practicals. What do you have to work with? How much land do you have to work with? How much power do you have to work with? How much space do you have to work with? How much water? Or ideally, if you can go waterless, like many of the designs we support, you know, how much water do you have to work with or can you get out of water as as a requirement? I think that that'd be the first conversation. The second is what are the priorities and goals? So, you know, generally, it's going to be a lot of folks are are are keen on speed, but that doesn't mean you need to compromise things like PUE, uptime, quality of equipment. In fact, some of the the folks that have made the biggest investment in in capacity to deliver have been some of the the longer living names in in HVAC systems. So, that's actually a great thing for our for a lot of our our customer set. But those are the first few things is is really just understanding what resources do you have, how does that influence thermal architecture, and then start start piecing together those building blocks for the thermal system. Brilliant. Thank you. Thank you so much. Some great advice there. We do have a little bit of time for a q and a section. Mhmm. So I wanna pose this to you as quick fire questions, thirty second answers. Sure. My first question to you here is how far away are most operators from needing to seriously consider higher density thermal strategies? I think, you know, if you're just considering it, you might be a little bit late, but then it's never too late. You know, I think everybody everybody's understood exactly how to cool, you know, your your lower density air cooling racks or storage type facilities. When it comes to these these high density liquid cooled AI, facilities, the time is now. That's that's really what we're seeing a lot of the growth come through. Not to say that cloud data centers have gone away, but AI factories tend to be where all the the growth really is. And so the the time to to learn and get get caught up is is today. There are plenty of, opportunities to learn. Johnson Controls has, you know, reference design guides out that'll that'll give you a good starting point. And, obviously, my team and and most of the colleagues that I have globally can help, get folks up to speed on what those strategies need to look like to manage those high density loads. So jump on the train now before it leaves. It's always a case that you're not Absolutely. Yeah. So my next question here is, what should organizations prioritize first when retrofitting existing facilities for this AI demand? I I think it first comes back to that that resource analysis. Right? What what truly are the resources you had? A lot of legacy data centers might have consumed a lot of water. And, again, when you're thinking about going from a certain number to a 100 x that number, right, whether it's, you know, 10 megawatts to a gigawatt or whatever that scale may look like, certain things like water may not be an option. Certain things like sound will will become a serious problem where it wasn't before. So really, benchmarking what what are the limitations you have, what are the capabilities you have, and then look at what space limitations that you have within the space. It might seem easy that, oh, man, my, you know, full row of racks that was a 100 kilowatts can now be one rack, so I could have, you know, you know, a megawatt in this in this row here, but that may not be possible with the amount of coolant that needs to be delivered, the amount of power that needs to come in, the additional amount of airflow that needs to come in. So, really doing that resource assessment and what the target is for that retrofit, how much AI capacity or or IT capacity you wanna deploy in there. Fabulous. And we have time for one more. So I'm gonna ask you this final question. It is what infrastructure decisions made today will have the biggest long term impact as AI density continues to grow? Someone answered this one from a cooling standpoint specifically, but, I I think planning for warmer and warmer water is the number one ticket to increased efficiency. Right? So, you know, we can sit there and look at at a given set of temperatures, this technology, you know, we talk about bag bearings being very popular, centrifugal compressors being more and more popular. We we can inch away at at one, two, three, four, 5% efficiency gains, but nothing is more efficient than the point where you can actually switch off the equipment. And so that happens more frequently for more hours when you can raise the chilled water from 20 c outlet to 24 and like I said, some folks are above 30 c in their chilled water outlet because some of the GPU's today can take 40 or 45 c into the chip as coolant. So, raising that chilled water temperature means that, you know, let's say in in a place like Europe where, you know, 80% of the hours are below about 25 Celsius, all of that time you may not need to run the chillers. You need the chillers, of course, for those peak hot days, but, you know, raising that warm water raising that temperature warmer and warmer means you get more hours of either low load or low compressor hours. And and that, you know, of course, maybe today you you you may not have those GPUs that work at those temperatures, but planning for that in the system buying equipment that can support those temperatures, is probably the best thing you can do in the long term to support higher higher density and and future warmer water chips. Well, thank you so much, Mihir, for your for your insights here. That does unfortunately bring us to the end of today's session. So a big thank you to everyone who has joined us online and, of course, to you for sharing your insights. If there is one key takeaway from today, it's this. AI workloads are changing the thermal and operational demands placed on data centers, but successful infrastructure strategy is about more than simply increasing cooling capacity. It's about designing environments that can balance density, efficiency, resilience, and long term adaptability, and that one is very important. And more importantly, it's not just a future challenge. Organizations are making decisions right now that will shape how effectively they can support the next generation of AI workloads in the years ahead. So the opportunity is clear. Start thinking about thermal strategy, not as a stand alone requirement, but as a core part of building scalable, resilient, and efficient AI infrastructure. This recording will be available online shortly, so you'll be able to revisit the discussion again and share it internally. Thanks again for joining us, and bye bye for now.